Transcription of Traffic Control Inspection Checklist Segment - simonsafe.com
{{id}} {{{paragraph}}}
Page 1 of 8 Traffic Control Inspection Checklist Segment : Simon Contractors Simon Contractors Description Originator: Initials Date Reviewed by: Distribution: Traffic Quality Manager, Site Assistant Traffic Manager of Operations Page 2 of 8 Section Traffic Control Plan Design Requirements Compliant (Y / N / N/A) Comments Posted Speed through detour work zone Is the posted speed in the work area reasonable considering the work activities, equipment movement, revised geometrics, road surface condition, lane and shoulder widths Roadway Surface Have all sections of roadway being utilized by construction vehicles been swept at the end of shift?
– Is the posted speed in the work area reasonable considering the work activities, equipment movement, revised geometrics, road surface condition, lane
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}
SIGNING AND PAVEMENT MARKING DESIGN, Design Standards, Signing and Pavement, Standards, Design, Signing, Marking, Pavement, VDOT GOVERNANCE DOCUMENT Traffic Engineering, VDOT GOVERNANCE DOCUMENT Traffic Engineering Design, This page intentionally left blank, STATE OF CONNECTICUT DEPARTMENT OF, CONNECTICUT DEPARTMENT OF TRANSPORTATION