PDF4PRO ⚡AMP

Modern search engine that looking for books and documents around the web

Example: bachelor of science

TYPICAL PUMP INSTALLATION DETAILS

4 1 IPS-D-AR-019NO REVISION PERMITTED UNLESS APPROVED BY STANDARD ORGANIZATIONDATEDATEIRANIAN PETROLEUM STANDARDSDRAWING SHEETTYPICAL PUMPINSTALLATION DETAILS4 2 IPS-D-AR-019NO REVISION PERMITTED UNLESS APPROVED BY STANDARD ORGANIZATIONDATEDATEIRANIAN PETROLEUM STANDARDSDRAWING PUMPBASE-MOUNTED END INSTALLATION DETAILGATE (OR GLOBE)VALVESTRAINERPRESSUREGAUGE COCKGATE (OR GLOBE)VALVECHECK VALVEFLEXIBLECONNECTIONFLANGEDINCREASERH OLD DOWNBOLT3/4" (DN20) DRAINVALVEMIN. 5 PIPES SUPPORTFINISHED FLOOR LEVELCONCRETE FOUNDATIONBASE PLATVIBRATIONISOLATORAS REQUIREDDISCHARGESUCTIONNOTES:2- 2 1/2" (DN65) AND LARGER SUCTION & DISCHARGE PIPE JOINTSSHALL BE WELDED AND FLANGED ACCORDING TO THE 2"(DN50) AND SMALLER PIPES SHALL HAVE THREADED 2 1/2" & LARGERFLANGED REDUCERFOR 2 1/2"& LARGERTHE TYPE OF ELBOW SHALL BE LONG RADIUSNOTES:1- THE PUMP SHALL BE INSTALLED DEAD LEVEL AND SHALL NOT TOUCH OR REST ON ANY PART OF THE BUILDING THE ELECTRICAL CONNECTION TO THE PUMP SHALL BE3-THE PUMP SHALL BE SO INSTALLED THAT THE PUMP CAN BE COMPLETELY REMOVED WITHOUT THE DISMANTLINGOR REMOVAL OF ANY PIPING OR THE MOTOR & COUPLING SHALL BE CHECKED ANDAND PROPERLY ALIGNED IN STRICT ACCORDANCE WITHWITH THE MANUFACTURER S THE ADJACENT PIPING SHALL BE CAREFULL ANDY FITTEDAND ERECTED SO THAT THE PUMP CAN BE INSTALLEDOR REMOVED FROM THE PIPE LINE WITHOUT FORCING OR AFTER THE SYSTEM HAS BEEN COMPLETED AND THETHE PUMP STARTED, THE PUMP AND SYSTEM SHALLBE

notes: 1- the pump shall be installed dead level and shall not touch or rest on any part of the building structure. 2- the electrical connection to the pump shall be

Loading..

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Spam in document Broken preview Other abuse

Transcription of TYPICAL PUMP INSTALLATION DETAILS

Related search queries