Transcription of U.P Pollution Control Board - uppcb.com
{{id}} {{{paragraph}}}
Pollution Control Board List of Documents to be attached along with the consent applications 1. CTE under Water and Air Act S no. Documents to be attached 1 A covering requisition letter stating the status of the industry and activities clearly. 2 Copy of attested sale Deed /Lease Deed or any other relevant documents as proof to ensure possession of the site/factory for which application is made by the applicant. 3 Copy of attested Memorandum of Articles in case of Public/Private sectors or registered partnership deed in case of partnership company. 4 Layout plan showing the location of various process equipments, utilities like boiler, generator etc, effluent treatment plant, outlet location, non-hazardous and hazardous waste storage yard.
U.P Pollution Control Board List of Documents to be attached along with the consent applications 1. CTE under Water and Air Act S no. Documents to be at ched 1 A covering requisition letter stating the status of the industry and activities
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}
Prevention and control, Water pollution from fertilizers and pesticides, Best Management Practices For Industrial, Pollution Prevention, CONTROL, Pollution, PREVENTION, PREVENTION AND CONTROL OF POLLUTION, Pollution control, SPCC REQUIREMENTS AND POLLUTION, SPCC REQUIREMENTS AND POLLUTION PREVENTION PRACTICES, Pollution Prevention Concepts and Principles, Guidance Document for Preparing a Stormwater