Transcription of Underground Commercial Distribution (UCD) Installation …
{{id}} {{{paragraph}}}
Supplement toSpecifications for Electrical InstallationsUnderground Commercial Distribution (UCD) Installation and Responsibility GuideElectric System Bulletin No. 759 BJuly 2010(Supersedes all previous versions of ESB 759) For the latest authorized version, please refer to the company s website at toSpecifications for Electrical InstallationsUnderground Commercial Distribution (UCD) Installation and Responsibility GuideElectric System Bulletin No. 759 BJuly 2010(Supersedes all previous versions of ESB 759) For the latest authorized version, please refer to the company s website at Grid / Supplement to Specifications for Electrical Installations / ESB 759B July 2010 TABLE OF CONTENTSUCD Specifications and Installation Guide Acknowledgement (Job Spec/Signoff Forms).
1.0 Scope The purpose of this specification is to define, interpret and clarify the scope of work and material dealing with services to padmounted transformers and is a Supplement to Electric SYstem Bulletin (ESB) 750). This specification does not cover any primary metering.
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}