Transcription of UNIVERSAL LIFTING BEAMS - Thomson Rail
{{id}} {{{paragraph}}}
Thomson ENGINEERING DESIGN Ltd UNIVERSAL LIFTING BEAMS Operators Manual Issue 08 November 2013 2 Index Safety Information 3 Safety Precautions 4 Risk Assessment 5 Operating Instructions 11 Attaching the UNIVERSAL beam 12 Setting the beam for Use 14 Using the UNIVERSAL LIFTING beam 16 Detaching the UNIVERSAL beam 17 Routine Maintenance 18 Maintenance Schedule 19 Setting and Testing Procedure 20 Setting the valve operating pad 23 Data Sheets for Recommended Lubricants 24 Panolin Biogrease 2 25 Panolin HLP Synth 30 Technical Data 35 Hydraulic Hose Schedule 36 Hydraulic Rotator 37 Appendix A Engineering Acceptance Certificate Appendix B Product Acceptance Certificate 3 Safety Information 4 Safety Precautions Application of the Device
5 UNIVERSAL LIFTING BEAM Risk Assessment Introduction In compiling this risk assessment it was immediately obvious that there are three distinct sets of risks associated with a) operation, b) lifting and handling and c) repair
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}
Reducing the risks associated with the manual, Reducing the risks associated with the manual handling, RISK MANAGEMENT POLICIES AND PROCEDURES, Reducing, Associated, Handling, Reducing the risks, Management of Manual Handling, Management of Manual Handling in, Manual handling, Steel PiPeline Sy StemS Handling and, Steel PiPeline Sy StemS Handling and inS tallation, Manual, Occupational Safety and Health Administration Occupational Safety and Health Administration Manual, TRISAG, Workplace Health and Safety