Transcription of UTC Production Part Approval Process (UPPAP)
{{id}} {{{paragraph}}}
This document contains no technical data subject to the EAR or ITAR COPIES PRINTED FROM THE ON LINE SYSTEM ARE CONSIDERED UNCONTROLLED AEROSPACE SUPPLIER QUALITY REQUIREMENTS 01 05/25/2016 1 of 21 Number: Revision: Effective Date: Page: 1. PURPOSE AND SCOPE This specification defines requirements for validating a manufacturing or assembly Process which produces parts for a United Technologies Corporation (UTC) Member company. The purpose of the specification is to ensure that all Member engineering and quality requirements are understood and fulfilled and that the manufacturing processes have been proven to consistently meet these requirements at the intended Production rate by integrating upfront quality planning. UPPAP will drive the identification and mitigation of risk early in the design and Process development phases and ensure continuous design and Process improvement.
This document contains no technical data subject to the EAR or ITAR COPIES PRINTED FROM THE ON–LINE SYSTEM ARE CONSIDERED UNCONTROLLED AEROSPACE SUPPLIER QUALITY REQUIREMENTS
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}
MATERIAL SOURCE APPROVAL REQUEST, MATERIAL SOURCE APPROVAL REQUEST North Dakota Department of Transportation, Material source, Request, Workers' Compensation, Approval, Retail Resource Center, 99 Study Material 10-24-2012, Material, Production Part Approval Process, Cooper Industries, SUPPLIER QUALITY REQUIREMENTS SQR-1, Analysis, Occupational Safety and Health Administration