Transcription of UTC Production Part Approval Process (UPPAP)
{{id}} {{{paragraph}}}
This document contains no technical data subject to the EAR or ITAR COPIES PRINTED FROM THE ON LINE SYSTEM ARE CONSIDERED UNCONTROLLED AEROSPACE SUPPLIER QUALITY REQUIREMENTS 01 05/25/2016 1 of 21 Number: Revision: Effective Date: Page: 1. PURPOSE AND SCOPE This specification defines requirements for validating a manufacturing or assembly Process which produces parts for a United Technologies Corporation (UTC) Member company. The purpose of the specification is to ensure that all Member engineering and quality requirements are understood and fulfilled and that the manufacturing processes have been proven to consistently meet these requirements at the intended Production rate by integrating upfront quality planning.
This document contains no technical data subject to the EAR or ITAR COPIES PRINTED FROM THE ON–LINE SYSTEM ARE CONSIDERED UNCONTROLLED AEROSPACE SUPPLIER QUALITY REQUIREMENTS
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}
Failure Modes and Effects Analysis Guide, Failure Modes and Effects Analysis, Fmea, Failure Mode and Effects Analysis, Healthcare Failure Mode and, Analysis, Healthcare Failure Mode and Effects Analysis, FMEA Failure Mode and Effects Analysis, Failure, Effects, DFR, Test and Failure Analysis, DFR, Test and Failure Analysis in Lean, FMEA for Beginners: Taking Preventive, FMEA for Beginners: Taking Preventive Action, FMEA Alignment VDA and AIAG