Transcription of VETTING OBSERVATIONS BY CHEVRON Root Cause
{{id}} {{{paragraph}}}
VETTING OBSERVATIONS BY CHEVRON Observation PSC on 20 April 2008 by USCG-Bow Thruster not operational root Cause : Equipment failure Corrective Action/Preventive Action Equipment is under warranty and arrangement has been made to deliver the requested Electrical parts at first convenient Port. In the meantime Master was instructed to use a Tug boat whenever is required. Observation No information concerning the emergency signal, muster points etc had been handed out to temporary (day) visitors. root Cause : Personnel safety protection Corrective Action/Preventive Action All visitors on their embarkation are instructed for the safety precautions that they have to take on board during their stay, this includes the use of mobile phones, smoking, lighters, emergency signals and muster points.
The primary and secondary emergency bilge suction valves had no numbered seals attached. There was no seal record on board.
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}