Issued by the Director of Energy SafetyWA Electrical RequirementsJanuary 2014WA Electrical Requirements January 2014 Edition1 Energy Safety Division (EnergySafety) of the Department of Commerce, following consultation with network operators and Electrical contracting industry groups in Western Australia, issued this updated version of the WA Electrical Requirements (WAER) which applies from 1 July installation designs commenced after 1 July 2014 must comply with this January 2014 version. Designs started before 1 July 2014, and projects under construction or for which building contracts are signed at that date, may comply with the earlier July 2008 version.
3.4 Point of Supply (Underground Low Voltage) 3.4.1 Standard Domestic Connection Typical point of supply arrangements for domestic connections are illustrated in the Figures below. In particular, the following principles apply: 1) A network operator’s service pillar on a lot is the point of supply for that lot and (in most cases)
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}