Transcription of Wakefield Five Towns
{{id}} {{{paragraph}}}
Wakefield five Towns Cycleway network Feasibility StudyTrain on the Pontefract train lineCyclists enjoying the traffic free route along Halfpenny LaneReport prepared for City of Wakefield Metropolitan District CouncilDraft September 2011- Binding Margin - Contents1. Introduction2. Policy context3. Current barriers to walking and cycling in the five 4. Maps with network proposals5. Technical notes6. Estimate of costs and deliverability7. Possible programme of works8. ConclusionReport prepared for City of Wakefield Written & surveyed by: Mike Babbitt and Jake WebsterGraphic design and illustrations prepared by Paul BostonREPORT INTENDED TO BE PRINTED IN FULL COLOUR ON A3 SIZE PAPERAll maps reproduced from the Ordnance Survey material with the permission of Ordnance Survey on behalf of the Controller of Her Majesty s Stationery Office Crown copyright. Unauthorised reproduction infringes Crown copyright and may lead to prosecution or civil makes smarter travel choices possible, desirable and inevitable.
Wakefield Five Towns Cycleway Network Feasibility Study Train on the Pontefract train line Cyclists enjoying the traffic free route along Halfpenny Lane
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}