Transcription of WATERPROOFING SPECIFICATION AND PROJECT …
{{id}} {{{paragraph}}}
Page |1. WATERPROOFING SPECIFICATION AND PROJECT REQUIREMENTS. CARLYLE HOUSE BANK BILDING. 131 N Fairfax St. Alexandria, VA 22314. PART 1 - GENERAL. SUMMARY OF WORK. A. The Contractor shall provide all supervision, labor, equipment, materials and implements necessary to perform all of the work included in this SPECIFICATION . In general, the work will include the following items. 1. Remove all existing WATERPROOFING related components and all associated flashings down to the substrate (concrete deck). a. The brick pavers shall be salvaged for re-installation. b. Concrete deck and other substrates shall be repaired on a unit price basis as an extra to the contract.
specification. In all cases, the referenced specification or standard shall be of the most recent publication date. Abbreviated identifications for the particular organizations involved are as listed below. 1. SMACNA - Sheet Metal and Air Conditioning Contractors National association, "Sheet Metal Manual", Sixth Edition, 2003. a.
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}