Transcription of WELL DESIGN, CEMENTING TECHNIQUES AND …
{{id}} {{{paragraph}}}
Orkustofnun, Grensasvegur 9, Reports 2014 IS-108 Reykjavik, Iceland Number 17 295 well design , CEMENTING TECHNIQUES AND well WORK-OVER TO LAND DEEP PRODUCTION CASINGS IN THE MENENGAI FIELD Abraham Wamala Khaemba Geothermal Development Company, Ltd. Box 17700-20100 Nakuru KENYA ABSTRACT Drilling has been ongoing at Menengai high temperature field since 2011. The wells are of regular well design with a 20" surface casing set at 60-70 m, 13 " anchor casing set at about 400 m depth and 9 " production casing set at between 800-1400 m. The intent is to drill the wells to a total depth of 2500-3000 m, with slotted 7" liners run to the bottom. All the casings used are grade K55, with threaded couplings.
Orkustofnun, Grensasvegur 9, Reports 2014 IS-108 Reykjavik, Iceland Number 17 295 WELL DESIGN, CEMENTING TECHNIQUES AND WELL WORK-OVER TO LAND DEEP PRODUCTION CASINGS
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}