PDF4PRO ⚡AMP

Modern search engine that looking for books and documents around the web

Example: barber

Where Activated Sludge Design Meets Operations

Where Activated Sludge Design Meets Operations : Plant Operations and Laboratory Analysis Workshop | Columbus, Ohio September 28 | 2011 MLSS = (SRT/HRT)[ISSin + Yg(BODin BODout)/(1 + b SRT)] by Eric J. Wahlberg Bridging the gap between engineers and What I have concluded: A most difficult bridge to gap But that s okay because the bugs are smarter than the engineers and operators In the beginning .. 2 A properly designed Activated Sludge system is flexible, reliable, and controllable 3 Good news: Minor operational changes can be implemented to accommodate changes in influent characteristics and/or effluent requirements. That s good news and bad news Bad news: Minor operational changes can result in changes in Sludge and effluent quality.

•One of my most favorite soapboxes. •Raising the bar by embracing the math and science of wastewater treatment and process engineering fundamentals.

Tags:

  Operations, Design, Activated, Sludge, Where, Meet, Where activated sludge design meets operations

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Spam in document Broken preview Other abuse

Transcription of Where Activated Sludge Design Meets Operations

Related search queries