Transcription of www.pipejacking.org
{{id}} {{{paragraph}}}
Formula Correction Guide to best practice for the installation of pipejacks and microtunnels The formula on page 50, figure 7, re permissible jacking loads has an error and one of the negative signs is misplaced. The correct formula appears below. Permissible Jacking load
is used fillin'J pits to assess the best pipe FN.ir'g method 'eleased Lubr Inter arid,'ar The pi-esenCE' anci oater, F:lemeŸlt any m is no Many such as location Dt interference
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}