8. TESTING POWER TRANSFORMERS
4. Check and Megger all wiring point to point: Fans, pumps, alarms, heaters, tap changers, and all other devices on the transformer and interconnecting cables 5. All banks above 150 MVA should be vacuum dried. Do not apply test voltages to the winding during the vacuum drying process. Make certain the terminals