Example: tourism industry
A SAMPLE LOCKOUT/TAGOUT PROCEDURE

A SAMPLE LOCKOUT/TAGOUT PROCEDURE

Back to document page

D. Outside Contractors -If outside contractors perform servicing or maintenance that requires lockout, the Safety Director shall take the following steps. 1. Inform the outside contractor of out company’s lockout procedures and supply them with a copy. 2. Obtain and review a copy of the outside contractor’s lockout procedures. 3.

  Safety, Lockout

Download A SAMPLE LOCKOUT/TAGOUT PROCEDURE


Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Other abuse

Advertisement

Related search queries