Example: bankruptcy
APPLICATION INSTRUCTIONS - Pool Solutions

APPLICATION INSTRUCTIONS - Pool Solutions

Back to document page

Page 2 Day 1: Follow the exact same steps as indicated under point 1 under the longer method. Day 2: Follow the steps as indicated under Day 2 of the longer method above. Wait approximately 60-90 minutes after application of the first top-coat layer. While the fist epoxy layers are still damp/tacky (60-90 min. test with touching), apply a second Top-coat layer (3rd epoxy layer) using Mowhair or

  Applications, Loops, Instructions, Application instructions, After

Download APPLICATION INSTRUCTIONS - Pool Solutions


Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Other abuse

Advertisement

Related search queries