Example: bankruptcy
Assembly line design and optimization - Proplanner
minutes of takt time. This project analyses the operations and balance losses at the current pre-assembly line, and intends to create a framework for the restructuring process that will optimize resource utilization. To conduct this study, the assembly line is observed and analyzed in order to evaluate the balance
Download Assembly line design and optimization - Proplanner
Information
Domain:
Source:
Link to this page: