welding, paintshop, pre-assembly, assembly and finish. Production runs on a single line with 65 minutes of takt time with an exception in the pre-assembly line of two parallel lines of 19 stations and 130 minutes of takt time. With this structure, the pre-assembly line acts as a factory within a

  Design, Line, Assembly, Optimization, Paintshop, Assembly line design and optimization