BEST PRACTICE SECTION 3 GUIDES SUPERSTRUCTURE
SECTION 3 - SUPERSTRUCTURE 3.4 DAMP PROOF COURSES AND CAVITY TRAYS Images 15, 16 and 17: DPCs and cavity trays should be installed at the correct level with stop ends and correctly positioned weep holes where necessary. Vertical DPCs should be installed to openings in the brickwork to prevent water ingress occurring.