Example: biology
BEST PRACTICE SECTION 3 GUIDES SUPERSTRUCTURE

BEST PRACTICE SECTION 3 GUIDES SUPERSTRUCTURE

Back to document page

SECTION 3 - SUPERSTRUCTURE 3.4 DAMP PROOF COURSES AND CAVITY TRAYS Images 15, 16 and 17: DPCs and cavity trays should be installed at the correct level with stop ends and correctly positioned weep holes where necessary. Vertical DPCs should be installed to openings in the brickwork to prevent water ingress occurring.

  Tray, Cavity, Dcps, Cavity trays, Superstructures

Download BEST PRACTICE SECTION 3 GUIDES SUPERSTRUCTURE


Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Other abuse

Advertisement