Example: air traffic controller
C-5. Permeable Pavement

C-5. Permeable Pavement

Back to document page

Jun 17, 2004 · The design volume for an infiltrating pavement system is equivalent to the volume that is stored in the aggregate and infiltrated into the ground within a 72-hour period. The design volume for a detention pavement system is the volume that is release slowly from the aggregate for a two to five-day period. Important Links Rule 15A NCAC 2H .1055.

  Design, Detention

Download C-5. Permeable Pavement


Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Other abuse

Advertisement

Related search queries