Code of Practice
C2 Beams with Intermediate Buckling Restraints 57 C3 Beams with No Intermediate Buckling Restraints 59 C4 Continuously Restrained Beams 60 C5 Buckling Restraints 62 ANNEX D INSPECTION, MAINTENANCE AND REPAIR D1 General 64 D2 Deterioration and Failure of Glazing Systems 64 D2.1 Typical forms of deterioration 64 D2.2 Glass failure 64 D3 Maintenance Management 65
Download Code of Practice
Information
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
Advertisement
Documents from same domain
Technical Memorandum for Supervision Plans 2009
www.bd.gov.hk2.1 This Technical Memorandum supplements the provisions of the Buildings Ordinance governing the supervision of building works and street works. 2.2 This Technical Memorandum sets out the principles, requirements and operation of supervision plans. It deals in particular with:- (a) the principles for the preparation of supervision plans;
Code of Practice for Precast Concrete Contruction 2016
www.bd.gov.hk2.5.3 Handling and transportation ... Precast concrete elements should be designed and constructed in compliance with the Building (Construction) Regulations and other relevant codes of practice. The design method specified in this code of practice for the design of precast concrete elements is
Central Data Bank List of Building Materials
www.bd.gov.hkIntumescent Coating Protection of steel columns up to 1 hr. FRP. BS 476: Parts 20 & 21: 1987 : N/A : The Loss Prevention Council : TE5944 : November 1986 : N/A : No-objection letter 18/01/2005 : issued in 1990. Required thickness of fire-resisting material should be in accordance with the test report no. TE5944. BD-FP 015 : Glulite Fire ...
Practice Note for Authorized Persons, Registered ...
www.bd.gov.hkHong Kong into a telecommunications, broadcasting and Internet hub in the Asia Pacific region. 2. To enable occupiers of a building to gain access to the full range of quality broadcasting, telecommunications and Internet services, the Telecommunications Authority has, under section 14 of the Telecommunications Ordinance, granted
Practice Note for Authorized Persons, Registered ...
www.bd.gov.hkmodelling, selection of geotechnical parameters and design water pressures, should be adopted. ... Alternatively, soil structure interaction analyses method may be carried out. 3.5.2 In soil structure interaction analyses, there could be a rapid increase in the maximum wall deflection/strut loads upon a small reduction in the wall
Modelling, Soil, Structure, Interactions, Soil structure interaction
Explanatory Notes to - Buildings Department
www.bd.gov.hkBS EN 1991-1-4. This enables shared use of future development work on these standards, and more direct use of data from these standards, where needed to supplement the Code. It may also assist with future convergence. Additional work was also carried out to resolve differences between these standards and to obtain better
Practice Note for Authorized Persons, Registered ...
www.bd.gov.hkrequirements for the design and construction of building, street, building works and street works. However, they do not contain reference to any specific prescriptive standard. 2. Appendix A lists those standards or technical criteria accepted by the Building Authority as complying with the performance requirements stipulated in the Regulations.
Code of Practice for Fire Safety in Buildings 2011
www.bd.gov.hkPart F – Fire Safety Management . Section 1 – General . F1 Use of this Part 164 . F2 Performance Requirements for Fire Safety Management 164 . F3 Scope 164 . Section 2 – Fire Safety Management . F4 Fire Safety Management 166 . Section 3 – Maintenance Plan . F5 Maintenance Plan 168. Section 4 – Training Plan . F6 Training Plan 172
(E) Other Fire Resisting Products (e.g. fire shutter, etc)
www.bd.gov.hkBD-E010 Suzuki Shutter Suzuki Shutter Co. (HK) Ltd. 120 - UKAS Warrington Fire Research Service Ltd WFRC No. C124741 Supplement to WFRC No 120584 20/6/2002 1/7/2007 8/9/2005 BD-E011 Fibreglass Reinforced Plastic (FRP) Panel Architectural Precast GRC Ltd. 30 - The Singapore Accreditation Service PSB Corporation PSB Test Report Ref.
Practice Note for Authorized Persons, Registered ...
www.bd.gov.hkRegistered Structural Engineers and Registered Geotechnical Engineers ADM-2 Centralized Processing of Building Plans ... the relevant practice notes: (a) Such features and their use together with a schedule listing the corresponding areas so exempted must be clearly stated in …
Related documents
THE BASICS OF ROOM AIR DISTRIBUTION
www.nebb.orgMar 22, 2011 · Chilled beams, etc • Some systems are partially or fully stratified. • Lets start by understanding basic terminology: Understanding The Terminology Primary Air Jets - Air jets from free round openings, grilles, perforated panels, ceiling diffusers and other outlets can be defined by three variables.
Centralized Vs Decentralized Air Conditioning Systems
seedengr.comThese typically use chilled water as a cooling medium and use extensive ductwork for air distribution. • Decentralized air conditioning systems typically serve a single or small spaces from a location within or directly adjacent to the space. These are essentially direct expansion (DX)* type and include:
BASIC HYDRONIC SYSTEM DESIGN - ctashrae.org
ctashrae.orgFan Coils, Chilled Beams, Finned Tube, Radiant, etc. Decoupler Primary Pumps Closely Spaced Tees P-1 & P-2 Distribution Piping Air / Dirt Separator Expansion Tank Secondary Pumps P-B-1 & P-B-2. 2 REFERRING TO PUMPS HEATING P-CH-1 P-CH-2 AS-2 ET-2 P-3 P-4 FCU FCU FCU FCU FCU FCU CH-1 CH-2 B-1 P-B-1 B-2 P-B-2 AS-1 ET-1 P-1 P-2 FCU COOLING Primary ...
Dedicated Outdoor Air Systems - Trane
www.trane.com(VRF) terminals, passive chilled beams, and radiant cooling surfaces. Figure 2. Advantages: Disadvantages: • Makes it easier to ensure the required amount of outdoor air reaches each zone, because separate ventilation diffusers allow easy airflow measurement and balancing • Affords opportunity to cycle off, or vary the speed of, the fan inside