Code of Practice - BD
5.2.1 Safety requirement against glass breakage 14 ... 9.1.3 Tempered glass 43 9.2 Glass Assemblies 44 9.2.1 Quality control of laminated glass 44 ... glass, also known as “thermally toughened glass” which has been subjected to a ...
Code, Practices, Glass, Safety, Code of practice, Tempered, Toughened, Toughened glass, Tempered glass
Download Code of Practice - BD
Information
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
Advertisement
Documents from same domain
Technical Memorandum for Supervision Plans 2009
www.bd.gov.hk2.1 This Technical Memorandum supplements the provisions of the Buildings Ordinance governing the supervision of building works and street works. 2.2 This Technical Memorandum sets out the principles, requirements and operation of supervision plans. It deals in particular with:- (a) the principles for the preparation of supervision plans;
Code of Practice for Precast Concrete Contruction 2016
www.bd.gov.hk2.5.3 Handling and transportation ... Precast concrete elements should be designed and constructed in compliance with the Building (Construction) Regulations and other relevant codes of practice. The design method specified in this code of practice for the design of precast concrete elements is
Central Data Bank List of Building Materials
www.bd.gov.hkIntumescent Coating Protection of steel columns up to 1 hr. FRP. BS 476: Parts 20 & 21: 1987 : N/A : The Loss Prevention Council : TE5944 : November 1986 : N/A : No-objection letter 18/01/2005 : issued in 1990. Required thickness of fire-resisting material should be in accordance with the test report no. TE5944. BD-FP 015 : Glulite Fire ...
Practice Note for Authorized Persons, Registered ...
www.bd.gov.hkHong Kong into a telecommunications, broadcasting and Internet hub in the Asia Pacific region. 2. To enable occupiers of a building to gain access to the full range of quality broadcasting, telecommunications and Internet services, the Telecommunications Authority has, under section 14 of the Telecommunications Ordinance, granted
Practice Note for Authorized Persons, Registered ...
www.bd.gov.hkmodelling, selection of geotechnical parameters and design water pressures, should be adopted. ... Alternatively, soil structure interaction analyses method may be carried out. 3.5.2 In soil structure interaction analyses, there could be a rapid increase in the maximum wall deflection/strut loads upon a small reduction in the wall
Modelling, Soil, Structure, Interactions, Soil structure interaction
Explanatory Notes to - Buildings Department
www.bd.gov.hkBS EN 1991-1-4. This enables shared use of future development work on these standards, and more direct use of data from these standards, where needed to supplement the Code. It may also assist with future convergence. Additional work was also carried out to resolve differences between these standards and to obtain better
Practice Note for Authorized Persons, Registered ...
www.bd.gov.hkrequirements for the design and construction of building, street, building works and street works. However, they do not contain reference to any specific prescriptive standard. 2. Appendix A lists those standards or technical criteria accepted by the Building Authority as complying with the performance requirements stipulated in the Regulations.
Code of Practice for Fire Safety in Buildings 2011
www.bd.gov.hkPart F – Fire Safety Management . Section 1 – General . F1 Use of this Part 164 . F2 Performance Requirements for Fire Safety Management 164 . F3 Scope 164 . Section 2 – Fire Safety Management . F4 Fire Safety Management 166 . Section 3 – Maintenance Plan . F5 Maintenance Plan 168. Section 4 – Training Plan . F6 Training Plan 172
(E) Other Fire Resisting Products (e.g. fire shutter, etc)
www.bd.gov.hkBD-E010 Suzuki Shutter Suzuki Shutter Co. (HK) Ltd. 120 - UKAS Warrington Fire Research Service Ltd WFRC No. C124741 Supplement to WFRC No 120584 20/6/2002 1/7/2007 8/9/2005 BD-E011 Fibreglass Reinforced Plastic (FRP) Panel Architectural Precast GRC Ltd. 30 - The Singapore Accreditation Service PSB Corporation PSB Test Report Ref.
Practice Note for Authorized Persons, Registered ...
www.bd.gov.hkRegistered Structural Engineers and Registered Geotechnical Engineers ADM-2 Centralized Processing of Building Plans ... the relevant practice notes: (a) Such features and their use together with a schedule listing the corresponding areas so exempted must be clearly stated in …
Related documents
DOT Number Database - NAGS
www.nags.com.audot‐204 texas tempered glass co houston, tx, usa dot‐205 mazzucchelli celluloide s.p.a. varese, italy dot‐206 chicago dial company chicago, il, usa dot‐207 thai safety glass co ltd bangkok, thailand dot‐208 summit polymers inc kalamazoo, mi, usa dot‐210 delta formed plastics inc elkhart, indiana, usa
Database, Glass, Safety, Number, Safety glass, Tempered, Dot number database, Tempered glass
CUSTOMS TARIFF - SCHEDULE
www.cbsa-asfc.gc.ca70.07 Safety glass, consisting of toughened (tempered) or laminated glass. -Toughened (tempered) safety glass: 7007.11.0000- -Of size and shape suitable for incorporation in …
HYUNDAI SOLAR MODULE UF
www.hyundaisolar.com.auWhite toughened safety glass, 3.2mm Zhejiang Renhe Photovoltaic Technology Co., Ltd./05-8 Staubli Electrical Connectors AG/ PV-KST4-EVO 2/xy_UR(male); PV-KBT4-EVO 2xy_UR(female) EVA Mechanical Characteristics Dimensions 1646×1140×35 mm (L×W×H) Back Sheet High weatherability backsheet Cells 158.75x158.75 PERC solar cells Cable Length 1500mm ...
Glass, Safety, Module, Solar, Hyundai, Toughened, Hyundai solar module, Toughened safety glass