the OE Inspection Performance as witnessed by the TxDOT observer. Signature of TxDOT Observer Observation Date Material Inspection MD X NA Documentation Attached 1. Pre-cast units must be from an approved source and an invoice received when delivered to the project. Cast in place units assure concrete is the specified class
Download CONSTRUCTION INSPECTION REPORT
Information
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
Documents from same domain
CONSTRUCTION INSPECTION REPORT
ftp.txdot.govIn addition to on-site Other Entity (OE) inspection review, TxDOT will verify OE inspection documentation is adequate during the course of construction. Note that not all activities listed below will be applicable on every project; therefore, inspection review is only necessary for the applicable
Report, Construction, Inspection, Construction inspection report
THIS PAGE LEFT BLANK - Texas Department of Transportation
ftp.txdot.govCompliant Work Zone Traffic Control Devices A. Introduction TxDOT A-1 December 2017. A. INTRODUCTION. This list contains products that have been evaluated and determined to be acceptable traffic control devices
Control, Blanks, This, Pages, Left, Traffic, Work, Zones, Traffic control, Work zone traffic control, This page left blank
DMS - 6310 JOINT SEALANTS AND FILLERS
ftp.txdot.govDEPARTMENTAL MATERIALS SPECIFICATION JOINT SEALANTS AND FILLERS TEXAS DEPARTMENT OF TRANSPORTATION 1 – 6 04/09–05/10 DMS - 6310 JOINT SEALANTS AND FILLERS EFFECTIVE DATES: APRIL 2009–MAY 2010. 6310.1. Description. This Specification establishes the requirements for the various types of joint sealants, backing materials, and joint fillers …
Joint, Sealant, 1306, Fillers, Joint sealant, Joint filler, Joint sealants and fillers, Dms 6310 joint sealants and fillers
1993 SPECIFICATIONS CSJ 0218-04-075 SPECIAL …
ftp.txdot.gov1993 SPECIFICATIONS CSJ 0218-04-075 SPECIAL SPECIFICATION ITEM 3148 WIDE FLANGE PAVEMENT EXPANSION JOINT 1. Description. This Item shall govern for the construction of wide ... Item 433, "Joint Sealants and Fillers" Item 440, "Reinforcing Steel" Item 442, "Metal For Structures"
Specification, 2018, Special, Joint, Expansion, Pavement, Sealant, Flange, Wide, Fillers, Joint sealants and fillers, 0218 04 075 special, 0218 04 075 special specification, Wide flange pavement expansion joint
ITEM 420 CONCRETE STRUCTURES
ftp.txdot.gov433, "Joint Sealants and Fillers". (a) Preformed Fiber Material. Preformed fiber expansion joint material shall conform to the dimensions shown on the plans. Unless otherwise specified, "Preformed Bituminous Fiber Material" shall be used. (b) Joint Sealing Material.
ITEM 360 CONCRETE PAVEMENT - ftp.txdot.gov
ftp.txdot.govUnless otherwise shown on the plans, the joint sealant materials to be used shall conform to the requirements of Class 5 joint sealant as described in Item 433, "Joint Sealants and Fillers". (3) Dowels for Expansion and Contraction Joints.
Special Specification 6007 Intelligent Transportation ...
ftp.txdot.govconnectors, moisture or water sealants, terminators, splice trays, fiber optic jumpers, pig tails, fiber patch panels, fiber interconnect housing, and accessories necessary to complete the fiber optic …
Specification, Brief, Special, Intelligent, Topics, Transportation, 7600, Fiber optic, The fiber optic, Special specification 6007 intelligent transportation
Item 420 Concrete Substructures - ftp.txdot.gov
ftp.txdot.gov420 2 Manila hemp may also be used to make burlap. Do not use burlap fabricated from bags. Do not use burlap containing any water soluble ingredient which will retard the setting time of concrete.
2014 Standard Specifications for Construction and ...
ftp.txdot.govStandard Specifications for Construction and Maintenance of Highways, Streets, and Bridges Adopted by the Texas Department of Transportation November 1, 2014
Standard Specifications for Construction and Maintenance ...
ftp.txdot.govEach specification is outlined by Articles and Sections. The basic Articles required for a specification are: 1. DESCRIPTION 2. MATERIALS 3. EQUIPMENT 4. CONSTRUCTION OR WORK METHODS 5. MEASUREMENT 6. PAYMENT Some Articles are not used in every Item. Measurement and Payment Articles are combined when the work described is
Related documents
Special Inspection Certificate - Phoenix, Arizona
www.phoenix.govSpecial Inspection. I understand and agree to inform the project owner, the contractor(s), and the special inspector(s) about all the Structural Special Inspection Program requirements and limitations, including that the Special Inspector(s) must be independent third-party individual(s) or Registered Design
Certificate, Special, Inspection, Special inspection certificate
High risk construction work Safe Work method statement ...
www.safework.nsw.gov.auinsufficient concrete strength. Structural collapse due to overloading incomplete formwork decks. • A structural inspection and formwork sign off will be undertaken by a competent person prior to materials being loaded onto formwork deck. • Supervisor will consult with the crane crew prior to any materials being loaded onto the formwork deck.
1. Stage of the building work - Department of Housing and ...
www.hpw.qld.gov.auForm 16 Inspection certificate ... after the placement of formwork and reinforcement for the slab but before the concrete. for the slab is poured • the final stage of the work. Nothing prevents a competent person (inspection) who is not a building certifier from giving inspection help for an aspect of a stage .
Checklist for the Concrete Pre-Construction Conference
www.vrmca.com• Concrete pumping contractor • Concrete finisher • Testing laboratory • Inspection agency • Other 6. Background information about the project 7. Unique features of the project 8. Distribution of completed checklist