Cb HOT MIX ASPHALT/BITUMINOUS PAVING (Sections 501-504, 805, 806, 814 Standard Specifications) This work shall consist of preparing the existing pavement and constructing HMA/Bituminous pavements, shoulders, and approaches. Also includes paver placed surface seal, HMA curb, HMA shared-use paths, paved ditches.