Example: barber
DETENTION FACILITY DESIGN AND ANALYSIS

DETENTION FACILITY DESIGN AND ANALYSIS

Back to document page

5.1.1 DETENTION PONDS Open ponds are the most desirable detention facilities for controlling runoff from developed areas. The design criteria in Section 5.1.1.1 are for detention ponds. However, many of the criteria also apply to infiltration ponds (Section 5.2.2), and water quality wetponds and combined detention/wetponds (Section 6.4).

  Detention

Download DETENTION FACILITY DESIGN AND ANALYSIS


Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Other abuse

Advertisement

Related search queries