Electrical Acceptance Tests - Architecture Engineering and ...

Electrical Acceptance Tests - Architecture Engineering and ...

Back to document page

Tests shall consist of visual inspections, manual operation, and electrical s testingunder all normal and expected abnormal operating conditions. The Owner shall be notified at least 3 working days in advance of all tests. Tests shall be witnessed by the Owner unless such witnessing is waived in writing. ELECTRICAL ACCEPTANCE TESTS 260800

  Tests, Waived