Example: biology
Electricity Generation Costs 2020 - GOV.UK
Introduction 6 • Section 6 discusses peaking technologies, presenting an alternative metric to levelised costs on a £/kW basis. • Section 7 presents scenarios of the effect of including wider system impacts in the cost of generation. • Annex 1 presents estimated levelised costs for a full range of technologies for 2025, 2030, 2035 and 2040.
Download Electricity Generation Costs 2020 - GOV.UK
15
Information
Domain:
Source:
Link to this page: