Example: bankruptcy
Energy Efficiency Design Summary: Prescriptive Method

Energy Efficiency Design Summary: Prescriptive Method

Back to document page

modeling and testing of the building is not required under this option. Certain substitutions are permitted. In which case, the applicable airtightness targets in Table 3.1.1.4.A must be met. ... Credit for air tightness allows the designer to substitute the requirements of

  Direct, Modeling

Download Energy Efficiency Design Summary: Prescriptive Method

15
Please wait..

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Other abuse

Related search queries