Example: bachelor of science
General Specification for Building 2017 Edition

General Specification for Building 2017 Edition

Back to document page

works/measures (including tree surgery works if so required) for individual existing tree, if any, within or in close vicinity (within 2000 mm) of the site boundary and/or works area throughout the Contract period. Temporary fencing, if necessary shall be provided to prevent the encroachment of equipment or materials and contamination of the

  General, 2017, Specification, Edition, Building, Surgery, General specification for building 2017 edition

Download General Specification for Building 2017 Edition


Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Other abuse

Advertisement

Related search queries