Guide to Cost PrediCtability in ConstruCtion
• consider possible scope variations in the tender as a contingency to adjust to the owner’s budget; • give designers sufficient time to finalize 100% bid documents for the pre-tender estimate; and • allow cost consultants or estimators sufficient time to prepare and finalize pre-tender estimates. During Tender