Example: air traffic controller
How-To Note: Developing a Project Logic Model

How-To Note: Developing a Project Logic Model

Back to document page

project logic model and its associated TOC are included in the Project Appraisal Document (PAD) that approves a project design (see ADS 201.3.3.13). While this How-To Note focuses on logic models at the project level, logic models are also used at the strategy level (specifically, results frameworks – see Box 1), and often at the activity level.

  Model, Project, Logic, Project logic model

Download How-To Note: Developing a Project Logic Model


Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Other abuse

Advertisement

Related search queries