Example: confidence
Installation Instructions - Carrier

Installation Instructions - Carrier

Back to document page

018 - 048 21" (533 mm) FRONT SERVICE 060 - 060 24" (610mm) CLEARANCE A07565 Fig. 1 − Fig. 2 Slope Coil Unit in Upflow Application B. Downflow Installation In this application, field conversion of the evaporator is required using accessory downflow kit along with an accessory base kit. Use fireproof resilient gasket, 1/8 to 1/4−in (3 to 6 mm ...

  Instructions

Download Installation Instructions - Carrier


Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Other abuse

Advertisement

Related search queries