Installation Instructions - GAF
minimum requirements. Note: Minimum net free ventilation area of 1 sq. foot per 150 sq. feet (1 sq. meter per 150 sq. meters) of ceiling area is required. When vents are located at the eaves and near the roof’s peak (balanced) for maximum air flow, ventilation may be reduced to 1 sq. foot per 300 sq. feet (1 sq. meter per 300 sq. meters).
Download Installation Instructions - GAF
Information
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
Advertisement
Documents from same domain
EnergyGuard Polyiso Insulation 20 & 25 PSI Data Sheet
www.gaf.comConsult RoofNav and FM Global Loss Prevention Data Sheets 1-28, 1-29, and 1-29R for approved fastener density for Polyisocyanurate Roof Insulations. If your fastener pattern is not listed, please contact Technical Services at 1-800-766-3411.
EVERGUARD TPO/PVC MECHANICALLY ATTACHED
www.gaf.comroofing industry – given by experts in the roofing industry. • Architectural Information Services (AIS) is a specification service that helps you to specify an approved GAF roofing system based on your specific roofing needs and will send you a general specification for that roofing system, as well as application
UL Evaluation Report - GAF
www.gaf.comIBC, Section 1510.6 of the 2012, 2009 and 2006 IBC and Section R908.6 of 2018 and 2015 IRC, Section R907.6 of the 2012, 2009 and 2006 IRC, as applicable. 7. INSTALLATION MATERIALS 7.1 Sheathing: The roof deck must be code-complying, minimum 3/8 …
PRODUCT INFORMATION SHEET Timberline Natural Shadow …
www.gaf.comMiami-Dade County Product Control Approved – 13-0419.04 (Available in Southeast; contact Technical Services at 800.766.3411) Florida Building Code Approved FL10124-R12 UL 997 modified to 110 mph ASTM D7158, Class H ASTM D3161, Class F ASTM D3018, Type 1 ASTM D3462 ICC ESR-1475, ESR-3267** Texas Department of Insurance
WeatherWatch Mineral-Surfaced Leak Barrier
www.gaf.comRoofing System Limited Warranty, see the GAF Shingle & Accessory Limited Warranty. 3 Source: International Building Code (IBC) and Residential Code (IRC) 4 Refer to UL Online Certification Directory for actual assemblies ©2020 GAF
System, Limited, Barriers, Lake, Mineral, Warranty, Roofing, Limited warranty, Surfaced, Roofing system limited warranty, Mineral surfaced leak barrier
GENERAL INSTRUCTIONS - GAF
www.gaf.comCantidades excesivas pueden producir ampollamiento en las tejas, además de ablandar el asfalto en las capas base y las barreras contra goteras, lo cual provocará goteo y manchas en el asfalto. STANDARD NAILING PATTERN: Nail shingles with 4 nails approximately 6 7/8” (174 mm) from bottom of shingle, in nailing area, as shown.
Camelot II Brochure - GAF
www.gaf.comCamelot®II Shingles complete a home with their classic, artisan-crafted look – at a surprisingly affordable price. Note: It is difficult to reproduce the color clarity and actual color blends of these products. Before selecting your color, please ask to see several full-size shingles.
12/15/2020 Florida Building Code Online - GAF
www.gaf.comINSPECTION: Upon request, a copy of this entire Evaluation Report shall be provided to the user by the manufacturer or its distributors and shall be available for inspection at the job site at the request of the Building Official. This Evaluation Report consists of pages 1 through 4. Prepared by: Robert J.M. Nieminen, P.E.
Deck Requirements for Existing Deck Boards
www.gaf.comSubstrate So Important? A shingle roof substrate is like the “found ation” for your roofing system. The substrate provides the smooth, structural base on which asphalt shingles are installed. If the substrate is inferior, the integrity of the roofing system may be compromised. What’s Considered A “Standard Deck”
Timberline HD - GAF
www.gaf.com2 ™15-year WindProven limited wind warranty on Timberline ® HDZ™ Shingles requires the use of GAF starter strips, roof deck protection, ridge cap shingles, and leak barrier or attic ventilation. See GAF Roofing System Limited Warranty for complete coverage and restrictions. Visit gaf.ca/LRS for qualifying GAF products.
Related documents
Electrical Installation Condition Report
www.electricaltestcertificates.co.uk1.3 Meter tails - distributor 1.4 Meter tails - consumer ... Examination of protective device(s) and base(s); correct type and rating (no signs of unacceptable ... Cable installation methods/practices appropriate to the type and nature of installation and external influences
Grounding & Bonding — Why it is done And How to Install ...
www.adamselectric.coopthe meter base before it is energized and before the seal or lock is installed. Some local jurisdictions may not permit the connection to be made in the meter base enclosure, but that is not the intent of the Code — the Code does allow it. Here is a suggestion. If one would always make the earth connection in the Service
User Manual - D-Link
eu.dlink.comJan 13, 2014 · D-Link DAP-1520 User Manual 2 Section 1 - Product Overview Network.Requirements • A wireless router with an active Internet connection. • IEEE 802.11ac draft, 802.11n, 802.11g, 802.11b or 802.11a
Requirements for Secondary Voltage Revenue Metering …
www.bchydro.cominside a designated electrical/meter room, and at least one meter socket shall be mounted as per section 6.16. 7. Exterior meter(s), not mounted inside a metal enclosure, no conduit arrangement is required for the purpose of meter communication; 8. Meter(s) inside wood frame construction above grade, no conduit
Specifications and Installation Guide
www.eversource.cominstallation schedule and the revised project completion date must be communicated in a timely manner. Requirements and Division of Responsibilities between the
Customer Guide for Electric Service for Ohio - FirstEnergy
www.firstenergycorp.comfor installation of a handhole or pedestal for connection of the customer’s service lateral at base of pole. 12 . ... Inquiries regarding specific meter related requirements can be directed to the Company's local Metering Services Section. Any inquiries regarding the NEC or
PWRview™ Owner’s Manual - Generac Power Systems
www.generac.comfollow proper installation requirements could result in death, serious injury, and equipment or property damage. (000120) Equipment damage. Verify all conductors are tightened to the factory specified torque value. Failure to do so could result in damage to the switch base. CAUTION (000121) Equipment damage. Perform functional tests in the
Manual, System, Installation, Requirements, Base, Owner s manual, Owner, Power, Generac, Generac power systems, Installation requirements