Example: stock market
Installation, Operation, and Maintenance

Installation, Operation, and Maintenance

Back to document page

9. Adjust the level of the unit with a leveler. Purging the Unit. The unit is shipped from the factory with a holdin g charge of nitrogen. All of this gas must be purged from the unit. To purge the unit, unscrew the pinch pipes from the ends of both gas and liquid refrigerant pipes. Make sure all gas has escaped before connecting the piping.

  Maintenance, Levels

Download Installation, Operation, and Maintenance


Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Other abuse

Advertisement

Related search queries