Example: stock market
Installation, Operation, and Maintenance
9. Adjust the level of the unit with a leveler. Purging the Unit. The unit is shipped from the factory with a holdin g charge of nitrogen. All of this gas must be purged from the unit. To purge the unit, unscrew the pinch pipes from the ends of both gas and liquid refrigerant pipes. Make sure all gas has escaped before connecting the piping.
Download Installation, Operation, and Maintenance
Information
Domain:
Source:
Link to this page: