Integrated report - Eskom
Eskom Holdings SOC Ltd A Navigation icons Performance highlights for the year A list of abbreviations and glossary of terms are available at the back of this report (pages 100 to 102)
Download Integrated report - Eskom
Information
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
Advertisement
Documents from same domain
for the six months ended 30 September 2017 - …
www.eskom.co.zaReviewed condensed group interim financial statements 1 Contents Currency of financial statements 1 Approval of the condensed group interim financial statements 2
Integrated report - Eskom
www.eskom.co.zaEskom Holdings SOC Ltd 1 About this report This integrated report is based on the principles contained in the International Integrated Reporting
CONSTRUCTION AND OPERATIONAL PHASE …
www.eskom.co.zaBraamhoek Access Roads Environmental Management Plan EMP 20060213 i DRAFT CONSTRUCTION AND OPERATIONAL PHASE ENVIRONMENTAL MANAGEMENT PLAN FOR THE PROPOSED CONSTRUCTION AND UPGRADING
Phases, Management, Operational, Construction, Plan, Management plan, Environmental, Construction and operational phase, Construction and operational phase environmental management plan
TECHNOLOGY TRANSFER AWARDS - Eskom
www.eskom.co.za2016 TECHNOLOGY TRANSFER AWARDS These awards recognize the leaders and the innovators who have applied EPRI research to produce significant results.
Policy Title: Eskom’s Procurement and Supply N/A
www.eskom.co.zaLTN Formatted 14.10.2010/TR formatted 21 April 2011/SM EDC Re-formatted 27.03.2014 32-2 Rev 6 Policy/Directive Template Policy Title: Eskom’s Procurement and Supply
Policy, Title, Supply, Procurement, Smoke, Policy title, Eskom s procurement and supply
PROJECT EXECUTION PLAN - Eskom
www.eskom.co.zaPROJECT EXECUTION PLAN SSHAC Level 3 Probabilistic Seismic Hazard Analysis For Vibratory Ground Motion for the Thyspunt Nuclear Siting Project, South Africa
STANDARD REFERENCE ESKASABG3 1 STANDARD …
www.eskom.co.zaSTANDARD FOR BUSH CLEARANCE REFERENCE REV AND MAINTENANCE WITHIN OVERHEAD ESKASABG3 1 POWERLINE SERVITUDES PAGE 3 OF 14 purposes.(Commercial Timber Growers Guideline)
ESKOM TRANSMISSION PROPOSED ARIADNE …
www.eskom.co.zaeskom transmission proposed ariadne - eros 400 kv/132 kv multi-circuit transmission line environmental authorisation (eia: 12/12/20/1272 and 12/12/20/1277) draft scoping …
Proposed, Scoping, Transmissions, Smoke, Eskom transmission proposed ariadne, Ariadne, Eskom transmission proposed ariadne eros, Eros
Lebatlane Game Reserve - Eskom
www.eskom.co.zaLEBATLANE GAME RESERVE DEVELOPMENT AND BUSINESS PLAN - EXECUTIVE SUMMARY - 7 MAY 07 1. INTRODUCTION This is a brief synopsis of comprehensive research, analysis and planning done towards
SOCIO-ECONOMIC IMPACT ASSESSMENT - Eskom …
www.eskom.co.zasocio-economic impact assessment as part of the environmental impact assessment process for the proposed thyspunt lines integration project …
Economic, Assessment, Impact, Impact assessment, Socio, Socio economic impact assessment
Related documents
GRI Standards - bpost
corporate.bpost.be4 2. bpost GRI Standards - General Standard disclosure 2.1 Identified material aspects and boundaries (GRI Disclosures 102-46 – 102-47) incl. stakeholder engagement (GRI Disclosures 102-40 – 102 …
TITLE PAGE - Pyramid Lines Limited
pyramidlines.com1. Rates published in this Tariff are stated in terms of U.S. Currency and apply per 1 Cubic Meter (M) or 1,000 Kilos (W), as indicated, whichever basis yields the greater revenue, except as otherwise specified.
Integrated report - Eskom
www.eskom.co.zaEskom Holdings SOC Ltd 1 About this report This integrated report is based on the principles contained in the International Integrated Reporting
GRI 101: FOUNDATION 2016 - Global Reporting Initiative
www.globalreporting.orgGRI 101: Foundation 2016 5 C. Using this Standard Overview of contents GRI 101: Foundation is the starting point for an organization to use the GRI Standards to report about its economic, environmental, and/or social impacts. • Section 1 of this Standard presents the Reporting Principles for defining report content and report quality.
Foundations, 2016, Reporting, Global, Initiative, Global reporting initiative, Gri 101, Foundation 2016
GRI 102: GENERAL DISCLOSURES 2016
www.globalreporting.org2 GRI 102: General Disclosures 2016 Contents Introduction 5 GRI 102: General Disclosures 7 1. Organizational profile 7 Disclosure 102-1 Name of the organization 7 Disclosure 102-2 Activities, brands, products, and services 7 Disclosure 102-3 Location of headquarters 8 Disclosure 102-4 Location of operations 8 Disclosure 102-5 Ownership and legal form 8
General, 2016, Disclosures, Gri 102, General disclosures 2016