Example: bachelor of science
NEC4 ENGINEERING & CONSTRUCTION CONTRACT
14/5/2018 Page 5 of 13 H:\Guidance documents\NEC 4 docs\NEC Overview.docx 5.8 Liabilities and insurance (Clauses 80 to 86) The terminology is changed from Employers/Contractor’s Risk to Client’s/Contractor’s Liabilities. Fault in design (within Client’s scope or PM’s instruction) is added as a liability.
Download NEC4 ENGINEERING & CONSTRUCTION CONTRACT
Information
Domain:
Source:
Link to this page: