OPERATING AND MAINTENANCE COST ESTIMATING …
to the electricity grid supplies less than 160 MWhpa. Sites that have annual power consumption greater than 160 MWh are considered large. More precise pricing information should be sought for sites with consumption greater than 1 GWhpa through consultation with the HWC Energy Efficiency group energy.efficiency@hunterwater.com.au.