PILE TESTING SPECIFICATION FOR DRIVEN PILES

PILE TESTING SPECIFICATION FOR DRIVEN PILES

Back to document page

Pile Testing Specification for Driven Piles 13 December 2005 load test on piles stop unless the pile has failed. The Engineer shall be informed immediately in the event of a pile failure. 12.5 Time Lapse for Testing . Driven pile selected for testing shall not be loaded after the installation. The minimum required time lapse is at least 14 days.