16. The maximum width of the gantries should normally be not more than 6m. For a proposed gantry wider than 6m, the proposal should be accompanied by justifications for such width viz. demonstration by a swept path analysis of the vehicles using the gantry. In addition, information on the frequency of the vehicles that would
Download Practice Note for Authorized Persons, Registered ...
Information
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
Advertisement
Documents from same domain
Code of Practice
www.bd.gov.hkC2 Beams with Intermediate Buckling Restraints 57 C3 Beams with No Intermediate Buckling Restraints 59 C4 Continuously Restrained Beams 60 C5 Buckling Restraints 62 ANNEX D INSPECTION, MAINTENANCE AND REPAIR D1 General 64 D2 Deterioration and Failure of Glazing Systems 64 D2.1 Typical forms of deterioration 64 D2.2 Glass failure 64 D3 Maintenance Management 65
Technical Memorandum for Supervision Plans 2009
www.bd.gov.hk2.1 This Technical Memorandum supplements the provisions of the Buildings Ordinance governing the supervision of building works and street works. 2.2 This Technical Memorandum sets out the principles, requirements and operation of supervision plans. It deals in particular with:- (a) the principles for the preparation of supervision plans;
Code of Practice for Precast Concrete Contruction 2016
www.bd.gov.hk2.5.3 Handling and transportation ... Precast concrete elements should be designed and constructed in compliance with the Building (Construction) Regulations and other relevant codes of practice. The design method specified in this code of practice for the design of precast concrete elements is
Central Data Bank List of Building Materials
www.bd.gov.hkIntumescent Coating Protection of steel columns up to 1 hr. FRP. BS 476: Parts 20 & 21: 1987 : N/A : The Loss Prevention Council : TE5944 : November 1986 : N/A : No-objection letter 18/01/2005 : issued in 1990. Required thickness of fire-resisting material should be in accordance with the test report no. TE5944. BD-FP 015 : Glulite Fire ...
Practice Note for Authorized Persons, Registered ...
www.bd.gov.hkHong Kong into a telecommunications, broadcasting and Internet hub in the Asia Pacific region. 2. To enable occupiers of a building to gain access to the full range of quality broadcasting, telecommunications and Internet services, the Telecommunications Authority has, under section 14 of the Telecommunications Ordinance, granted
Practice Note for Authorized Persons, Registered ...
www.bd.gov.hkmodelling, selection of geotechnical parameters and design water pressures, should be adopted. ... Alternatively, soil structure interaction analyses method may be carried out. 3.5.2 In soil structure interaction analyses, there could be a rapid increase in the maximum wall deflection/strut loads upon a small reduction in the wall
Modelling, Soil, Structure, Interactions, Soil structure interaction
Explanatory Notes to - Buildings Department
www.bd.gov.hkBS EN 1991-1-4. This enables shared use of future development work on these standards, and more direct use of data from these standards, where needed to supplement the Code. It may also assist with future convergence. Additional work was also carried out to resolve differences between these standards and to obtain better
Practice Note for Authorized Persons, Registered ...
www.bd.gov.hkrequirements for the design and construction of building, street, building works and street works. However, they do not contain reference to any specific prescriptive standard. 2. Appendix A lists those standards or technical criteria accepted by the Building Authority as complying with the performance requirements stipulated in the Regulations.
Code of Practice for Fire Safety in Buildings 2011
www.bd.gov.hkPart F – Fire Safety Management . Section 1 – General . F1 Use of this Part 164 . F2 Performance Requirements for Fire Safety Management 164 . F3 Scope 164 . Section 2 – Fire Safety Management . F4 Fire Safety Management 166 . Section 3 – Maintenance Plan . F5 Maintenance Plan 168. Section 4 – Training Plan . F6 Training Plan 172
(E) Other Fire Resisting Products (e.g. fire shutter, etc)
www.bd.gov.hkBD-E010 Suzuki Shutter Suzuki Shutter Co. (HK) Ltd. 120 - UKAS Warrington Fire Research Service Ltd WFRC No. C124741 Supplement to WFRC No 120584 20/6/2002 1/7/2007 8/9/2005 BD-E011 Fibreglass Reinforced Plastic (FRP) Panel Architectural Precast GRC Ltd. 30 - The Singapore Accreditation Service PSB Corporation PSB Test Report Ref.
Related documents
Traffic Signs Manual - Chapter 4 - Warning Signs
assets.publishing.service.gov.uk1.16 Working drawings 13 2 JUNCTIONS 14 2.1 General 14 2.2 Priority junctions 15 ... as gantries, bridges, railings, etc.) but also carriageway markings, beacons, studs, bollards, ... 1.5.1. Any reference to a “Chapter” is a reference to a Chapter of the Traffic Signs Manual, and
OFFICE OF THE UNITED STATES TRADE REPRESENTATIVE …
ustr.gov(16) Printed circuit board assemblies designed for use in displaying operational performance of medical infusion equipment (described in statistical reporting number 9018.90.7580) (17) Combined positron emission tomography/computed tomography (PET/CT) scanners which utilize multiple PET gantries (frames) on a common base
Traffc Signs Manual - GOV.UK
assets.publishing.service.gov.ukU1.7 Structure and scope of this Chapter 10 U1.8 Legal status 10 U1.9 Concepts and objectives 11 ... U2.6 Risk sharing 16 U2.7 Designer training and competence 16 U2.8 Mounting and lighting of signs 18 ... as gantries, bridges, railings, etc) but …
Traffic Signs Manual - Chapter 1 Introduction
assets.publishing.service.gov.ukChapter 1 Introduction Department for Transport Department for Infrastructure (Northern Ireland) ... directional and tourist signs 16 4.5 Design of signs 18 5 POSITIONING OF SIGNS 20 5.1 . General . 20 ... as gantries, bridges, railings, etc) but …
ctbuh.org/papers
global.ctbuh.orgunderslung mobile gantries which traveled on a permanent track of steel rails. The gantry system track serves double duty as a Building Maintenance Unit, therefore the track was designed to be hidden within the reveal pattern of the façade panels. Engineering One of the primary design issues tackled by the architects and engineers was building
Practice Note for Authorized Persons, Registered ...
www.bd.gov.hkgantries, and catch platforms. 22. Every effort must be made to minimie any nuisance to the public arising s from dust, noise and vibration. Design of Hoarding, Covered Walkway, Gantry and Catch Platform . 23. Reference could be made to Chapter 3 of the Demolition for the Code