Practice Note for Authorized Persons, Registered ...
Required actions from the RSE prior to consent application for piling works 4. Prior to consent application, the RSE is required to with the confirm Registered Specialist Contractor (RSC) the method of construction including the maximum number of piles to be driven concurrently and the relevant details of the construction plants.
Download Practice Note for Authorized Persons, Registered ...
Information
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
Advertisement
Documents from same domain
Code of Practice
www.bd.gov.hkC2 Beams with Intermediate Buckling Restraints 57 C3 Beams with No Intermediate Buckling Restraints 59 C4 Continuously Restrained Beams 60 C5 Buckling Restraints 62 ANNEX D INSPECTION, MAINTENANCE AND REPAIR D1 General 64 D2 Deterioration and Failure of Glazing Systems 64 D2.1 Typical forms of deterioration 64 D2.2 Glass failure 64 D3 Maintenance Management 65
Technical Memorandum for Supervision Plans 2009
www.bd.gov.hk2.1 This Technical Memorandum supplements the provisions of the Buildings Ordinance governing the supervision of building works and street works. 2.2 This Technical Memorandum sets out the principles, requirements and operation of supervision plans. It deals in particular with:- (a) the principles for the preparation of supervision plans;
Code of Practice for Precast Concrete Contruction 2016
www.bd.gov.hk2.5.3 Handling and transportation ... Precast concrete elements should be designed and constructed in compliance with the Building (Construction) Regulations and other relevant codes of practice. The design method specified in this code of practice for the design of precast concrete elements is
Central Data Bank List of Building Materials
www.bd.gov.hkIntumescent Coating Protection of steel columns up to 1 hr. FRP. BS 476: Parts 20 & 21: 1987 : N/A : The Loss Prevention Council : TE5944 : November 1986 : N/A : No-objection letter 18/01/2005 : issued in 1990. Required thickness of fire-resisting material should be in accordance with the test report no. TE5944. BD-FP 015 : Glulite Fire ...
Practice Note for Authorized Persons, Registered ...
www.bd.gov.hkHong Kong into a telecommunications, broadcasting and Internet hub in the Asia Pacific region. 2. To enable occupiers of a building to gain access to the full range of quality broadcasting, telecommunications and Internet services, the Telecommunications Authority has, under section 14 of the Telecommunications Ordinance, granted
Practice Note for Authorized Persons, Registered ...
www.bd.gov.hkmodelling, selection of geotechnical parameters and design water pressures, should be adopted. ... Alternatively, soil structure interaction analyses method may be carried out. 3.5.2 In soil structure interaction analyses, there could be a rapid increase in the maximum wall deflection/strut loads upon a small reduction in the wall
Modelling, Soil, Structure, Interactions, Soil structure interaction
Explanatory Notes to - Buildings Department
www.bd.gov.hkBS EN 1991-1-4. This enables shared use of future development work on these standards, and more direct use of data from these standards, where needed to supplement the Code. It may also assist with future convergence. Additional work was also carried out to resolve differences between these standards and to obtain better
Practice Note for Authorized Persons, Registered ...
www.bd.gov.hkrequirements for the design and construction of building, street, building works and street works. However, they do not contain reference to any specific prescriptive standard. 2. Appendix A lists those standards or technical criteria accepted by the Building Authority as complying with the performance requirements stipulated in the Regulations.
Code of Practice for Fire Safety in Buildings 2011
www.bd.gov.hkPart F – Fire Safety Management . Section 1 – General . F1 Use of this Part 164 . F2 Performance Requirements for Fire Safety Management 164 . F3 Scope 164 . Section 2 – Fire Safety Management . F4 Fire Safety Management 166 . Section 3 – Maintenance Plan . F5 Maintenance Plan 168. Section 4 – Training Plan . F6 Training Plan 172
(E) Other Fire Resisting Products (e.g. fire shutter, etc)
www.bd.gov.hkBD-E010 Suzuki Shutter Suzuki Shutter Co. (HK) Ltd. 120 - UKAS Warrington Fire Research Service Ltd WFRC No. C124741 Supplement to WFRC No 120584 20/6/2002 1/7/2007 8/9/2005 BD-E011 Fibreglass Reinforced Plastic (FRP) Panel Architectural Precast GRC Ltd. 30 - The Singapore Accreditation Service PSB Corporation PSB Test Report Ref.
Related documents
SWOT Student example
stu.westga.eduI am currently employed as an educational technology support specialist (ETSS) at East Coweta High School. Coweta County School System has an ETSS assigned to each school in the county. My primary job duties are to repair, maintain, and troubleshoot computers, printers, scanners, and other such equipment. My secondary job
Practice Note for Authorized Persons, Registered ...
www.bd.gov.hkRegistered Specialist Contractor for Pre and Post-construction Proof Drilling . 4. All pre-drilling, interface core drilling, post-installation drilling and proof ... is included in the piling record plans and reports. 13. Should the overall actual founding levels of piles differ from the anticipated
Federal Income Tax on Timber - US Forest Service
www.fs.fed.us6 1. Made a Timber* Sale • Expenses of sale * The term “timber” includes the parts of standing trees that could be used to manufacturer lumber, pulpwood, veneer, poles, piling, crossties, chip-n-saw, and other wood products. Also included are evergreen (conifer) trees aged 6 years or older when they are severed from their roots and sold for ornamental purposes, e.g., Christmas trees.
A Guide to the Removal-Fill Permit Process
www.oregon.govChapter 11: Advance Mitigation Credit for Piling Removal This guide addresses existing laws and rules governing removal-fill activities in Oregon and provides practical tips for complying with Department of State Lands regulations. It explains ... specialist to provide technical guidance to supervisors, staff and peers from other ...
Principles of Measurement - RICS
www.rics.org5. Space for specialist's offices and stores 6. Clearing away rubbish 7. Scaffolding required by the specialist, giving particulars 8. Unloading, distributing, hoisting and placing in position items of plant, machinery or the like, giving particulars. GP7 Goods, materials or services to be provided by a merchant or tradesman nominated by the ...
Principles, Measurement, Specialists, Principles of measurement
SPECIFIC REGISTRATION REQUIREMENTS FOR …
www1.bca.gov.sgpiling rigs and executed a piling project of at least $3million on its own. Applicants are required to obtain the Specialist Builder Piling Works Licence SB(PW). CR09 Repairs & Redecoration Repainting and minor non-structural repair of buildings and existing structures. These
CW SRR SPECIFIC REGISTRATION REQUIREMENTS FOR …
www1.bca.gov.sgFirms which undertake piling works, ground support and stabilization works or site investigation works should register under CR08, CR12 and CR15 respectively. ... /Specialist Diploma in M&E Coordination awarded by BCA Academy. iii) Such other diplomas or qualifications as approved by BCA from time to time.
Requirements, Registration, Specific, Specialists, Piling, Specific registration requirements for