Resource Adequacy Requirements

Resource Adequacy Requirements

Back to document page

v measured against the sum of the RTOs’ non-coincident peak loads, and (b) 16.5% if measured against the coincident peak load of the combined system.1 Figure ES-1 also shows that the total average annual cost curve is relatively flat near the