SECTION 1: SCOPE OF WORK /SPECIFICATION FOR …

SECTION 1: SCOPE OF WORK /SPECIFICATION FOR …

Back to document page

(See installation procedure in section 4(b)(ii) below). iii. Install new mixer shower, stainless steel rain shower head and solid brass shower arm in the two bathrooms mentioned above to replace the bathtubs.(See plumbing procedures in section 4 (b)(i) below) iv. Remove the existing soft woods storage cabinet (vanities) in all the three bathrooms