Example: tourism industry
SECTION 20 HORIZONTAL DIRECTIONAL DRILLING …

SECTION 20 HORIZONTAL DIRECTIONAL DRILLING …

Back to document page

actual horizontal and vertical alignment of the pilot bore at intervals not exceeding 30 feet. This “as built” plan and profile shall be updated as the pilot bore is advanced. The Contractor shall at all times provide and maintain instrumentation that will accurately locate the pilot hole and measure drilling fluid flow and pressure.

  Horizontal, Vertical, Vertical and horizontal

Download SECTION 20 HORIZONTAL DIRECTIONAL DRILLING …


Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Other abuse

Advertisement

Related search queries