STAKEHOLDER ENGAGEMENT PLAN (Sample Contents)
underground, medium voltage electric power cables connecting the turbines with a transformer station transformer station (medium / high voltage), located well within the boundary of the wind farm 10.7 km-long high-voltage power line (400kV) connecting the transformer station and the overhead power line (400kV) at Bavanište.