Example: biology
STANDARD FOR RIPRAP

STANDARD FOR RIPRAP

Back to document page

Riprap for banks shall extend up the banks to the level of the design storm or the top of bank, whichever is lower. In channels where no riprap or paving is required in the bottom, but is required on the banks, the toe of the bank riprap shall extend below the channel bottom a distance at least 8 times the maximum stone size, but in no case more

  Riprap

Download STANDARD FOR RIPRAP


Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Other abuse

Advertisement

Related search queries