UL Evaluation Report - GAF
IBC, Section 1510.6 of the 2012, 2009 and 2006 IBC and Section R908.6 of 2018 and 2015 IRC, Section R907.6 of the 2012, 2009 and 2006 IRC, as applicable. 7. INSTALLATION MATERIALS 7.1 Sheathing: The roof deck must be code-complying, minimum 3/8 …
Download UL Evaluation Report - GAF
Information
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
Advertisement
Documents from same domain
EnergyGuard Polyiso Insulation 20 & 25 PSI Data Sheet
www.gaf.comConsult RoofNav and FM Global Loss Prevention Data Sheets 1-28, 1-29, and 1-29R for approved fastener density for Polyisocyanurate Roof Insulations. If your fastener pattern is not listed, please contact Technical Services at 1-800-766-3411.
EVERGUARD TPO/PVC MECHANICALLY ATTACHED
www.gaf.comroofing industry – given by experts in the roofing industry. • Architectural Information Services (AIS) is a specification service that helps you to specify an approved GAF roofing system based on your specific roofing needs and will send you a general specification for that roofing system, as well as application
PRODUCT INFORMATION SHEET Timberline Natural Shadow …
www.gaf.comMiami-Dade County Product Control Approved – 13-0419.04 (Available in Southeast; contact Technical Services at 800.766.3411) Florida Building Code Approved FL10124-R12 UL 997 modified to 110 mph ASTM D7158, Class H ASTM D3161, Class F ASTM D3018, Type 1 ASTM D3462 ICC ESR-1475, ESR-3267** Texas Department of Insurance
WeatherWatch Mineral-Surfaced Leak Barrier
www.gaf.comRoofing System Limited Warranty, see the GAF Shingle & Accessory Limited Warranty. 3 Source: International Building Code (IBC) and Residential Code (IRC) 4 Refer to UL Online Certification Directory for actual assemblies ©2020 GAF
System, Limited, Barriers, Lake, Mineral, Warranty, Roofing, Limited warranty, Surfaced, Roofing system limited warranty, Mineral surfaced leak barrier
GENERAL INSTRUCTIONS - GAF
www.gaf.comCantidades excesivas pueden producir ampollamiento en las tejas, además de ablandar el asfalto en las capas base y las barreras contra goteras, lo cual provocará goteo y manchas en el asfalto. STANDARD NAILING PATTERN: Nail shingles with 4 nails approximately 6 7/8” (174 mm) from bottom of shingle, in nailing area, as shown.
Camelot II Brochure - GAF
www.gaf.comCamelot®II Shingles complete a home with their classic, artisan-crafted look – at a surprisingly affordable price. Note: It is difficult to reproduce the color clarity and actual color blends of these products. Before selecting your color, please ask to see several full-size shingles.
12/15/2020 Florida Building Code Online - GAF
www.gaf.comINSPECTION: Upon request, a copy of this entire Evaluation Report shall be provided to the user by the manufacturer or its distributors and shall be available for inspection at the job site at the request of the Building Official. This Evaluation Report consists of pages 1 through 4. Prepared by: Robert J.M. Nieminen, P.E.
Deck Requirements for Existing Deck Boards
www.gaf.comSubstrate So Important? A shingle roof substrate is like the “found ation” for your roofing system. The substrate provides the smooth, structural base on which asphalt shingles are installed. If the substrate is inferior, the integrity of the roofing system may be compromised. What’s Considered A “Standard Deck”
Timberline HD - GAF
www.gaf.com2 ™15-year WindProven limited wind warranty on Timberline ® HDZ™ Shingles requires the use of GAF starter strips, roof deck protection, ridge cap shingles, and leak barrier or attic ventilation. See GAF Roofing System Limited Warranty for complete coverage and restrictions. Visit gaf.ca/LRS for qualifying GAF products.
Silver Pledge Limited Warranty - GAF
www.gaf.comThe Legal Stuff What Is Covered/Excluded. This Silver Pledge™ Limited Warranty covers certain GAF roofing products installed on your roof (the “GAF Products”) including GAF Asphaltic Shingles, GAF Ridge Cap Shingles, GAF Starter Strip Shingles, GAF Leak Barrier Products, GAF Roof Deck Protection Products, GAF Cobra ® Attic Ventilation Products, and GAF-labeled …
Limited, Silver, Warranty, Pledge, Labeled, Silver pledge limited warranty
Related documents
Guidelines for attic ventilation
docserver.nrca.netThe International Building Code,® 2012 Edition (IBC 2012) requires enclosed attics and enclosed rafter spaces formed where ceilings are applied directly to the underside of roof framing to have cross-ventilation for each separate space. The net free vent area (NFVA) shall not be less than 1:150 of the area of the space being vented. Blocking and
International, Code, Building, 2012, Ventilation, International building code, 2012 ibc
The Five Walls of the IBC - iccsafe.org
media.iccsafe.orgThe Five Walls of the IBC ... (2012, 2015) Opening Protectives Table 715.4 / 716.5: Fire Door and Fire Shutter Fire Protection Ratings a. Two doors, each with a fire protection rating of 1 1/2 hours, installed on opposite side of the same opening in a fire wall, shall be deemed equivalent in fire protection rating to one 3-
Fire Table 602 Distances. - iccsafe.org
media.iccsafe.org602. The IBC indicates that the distances are measured at right angles to the face of the exterior wall (see definition of “Fire separation distance” in Section 202), which would result in the fire-resistive requirements for exterior walls not applying to walls that are at right angles to the lot line. See Figure 602-1.
2012 IBC Use of Fire and Smoke Separations- - VFPA
www.vfpa.orgBased on the 2012 International Building Code, ® IBC® Course Description This seminar addresses the provisions of the 2012 International Building Code ® (IBC®) regarding the use of fire and smoke separations. 2012 IBC Use of Fire and Smoke Separations 2 Objectives Upon completion, participants will be better able to: 1.
International, Code, Building, 2012, 2012 international building code, 2012 ibc
Design Example 1 Design Spectral Response Acceleration ...
shop.iccsafe.org2 2012 IBC SEAOC Structural/Seismic Design Manual, Vol. 1 2. Site Coefficients F a and F v and MCE R Spectral Response Acceleration Parameters S MS and S M1 Adjusted for Site Class Effects §11.4.3 For the given Site Class D and the values of S S and S 1 determined above, the site coefficients are F a = 1.293 T11.4-1
UL Evaluation Report - Johns Manville
www.jm.com2015, 2012, 2009 and 2006 IBC and Section R902.1 of the 2018, 2015, 2012, 2009 and 2006 IRC. Wind Uplift Resistance: Roofing assemblies covered under this report have been tested for wind uplift resistance in accordance with FM 4474, and therefor qualify for use under Roofing membranes Section 1504.3.1 of the 2018, 2015, 2012, 2009 and 2006 IBC.
IBC Code Revisions to Fire-Rated Glass in Doors
www.ngp.com2012 IBC Limits Size of Fire-Rated Glass in Doors The 2012 IBC limits the size of fire-protection- rated glass, such as safety wired glass and safety glass ceramic, used in 60 and 90 minute doors to 100 sq. inches. If the door serves as a horizontal exit door in a fire wall it is further restricted to 100 sq. inches with no dimension exceed-
Glass, Doors, Trade, Fire, 2012, 2012 ibc, Fire rated glass in doors
INTERNATIONAL BUILDING CODE 2012 Edition
www.sbcc.wa.govINTERNATIONAL BUILDING CODE 2012 Edition Includes adoption of and amendments to the 2012 International Existing Building Code and ICC/ANSI A117.1-2009 Washington State Building Code Council Effective July 1, 2013 . Copies of the State Building Codes and
International, Code, Building, 2012, 2012 international building code