Example: dental hygienist
Work Breakdown Structure Reference Guide

Work Breakdown Structure Reference Guide

Back to document page

work breakdown structures (CWBS). If numbering system conversion is not possible without substantial cost, a coding interface conversion system will have to be applied down to the CWBS control levels or, as a minimum, at the top level of the CWBS. PWBS examples can be found in Appendix C. Contract WBS

  Structure, Work, Breakdown, Work breakdown structure, Work breakdown

Download Work Breakdown Structure Reference Guide


Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Other abuse

Advertisement

Related search queries