Example: air traffic controller

Townhall Meeting TLM Energy (UK) Limited BRAE …

Townhall 171201 Townhall 171201 Slide 15 Townhall Meeting17 December 2001 BEATRICECLAYMOREPETRONELLAMacCUL LOCHHANNAYCLYDEHALLEYBUCHANPIPERBRAES cotlandFlottaCruden BaySt. FergusNigg Bay0100 kmBEAULYA berdeenFULMARTLM Energy (UK) LimitedOil FieldGas FieldOil PipelineGas PipelineTalisman inc. Lundin InterestsBEECHNUTACORNROSSORIONBLAKEHIGH LANDER TARTAN AndrewC L A Y M O R EClaymore A , Infrastructure Code of PracticePage 1 Last Updated:June 2013 The claymore complex is located in block 14/19n of the United Kingdom Continental Shelf located 161 km north east of Aberdeen in the Central North Sea. Located at co-ordinates 58 26 58 N, 00 15 13 W, it stands in approximately 110m of water.

Townhall 171201 Slide 15 Townhall Meeting 17 December 2001 BEATRICE CLAYMORE PETRONELLA MacCULLOCH HANNAY CLYDE HALLEY BUCHAN PIPER BRAE Scotland Flotta Cruden Bay

Tags:

  Claymore

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Other abuse

Advertisement

Transcription of Townhall Meeting TLM Energy (UK) Limited BRAE …

1 Townhall 171201 Townhall 171201 Slide 15 Townhall Meeting17 December 2001 BEATRICECLAYMOREPETRONELLAMacCUL LOCHHANNAYCLYDEHALLEYBUCHANPIPERBRAES cotlandFlottaCruden BaySt. FergusNigg Bay0100 kmBEAULYA berdeenFULMARTLM Energy (UK) LimitedOil FieldGas FieldOil PipelineGas PipelineTalisman inc. Lundin InterestsBEECHNUTACORNROSSORIONBLAKEHIGH LANDER TARTAN AndrewC L A Y M O R EClaymore A , Infrastructure Code of PracticePage 1 Last Updated:June 2013 The claymore complex is located in block 14/19n of the United Kingdom Continental Shelf located 161 km north east of Aberdeen in the Central North Sea. Located at co-ordinates 58 26 58 N, 00 15 13 W, it stands in approximately 110m of water.

2 The claymore complex contains two fixed steel bridge-linked platforms, the claymore Production Platform (CPP) and claymore Accommodation Platform (CAP). The CPP, weighing approximately 36,000 tonnes, sits on a conventional eight-legged steel jacket and provides process and drilling facilities. The CAP is much smaller at around 8,000 tonnes, and provides accommodation and utilities for staff, and the helideck. The platforms are linked by 106m bridge. Design work on the platform started in 1974 after the field was discovered in May of that year. The claymore Production Platform was installed in 1976 with first production from the claymore field commencing in November 1977 and the claymore Accommodation Platform was installed in Scapa field was developed as a subsea tie-back to the claymore platform in (Joint Venture Partners)Talisman Sinopec Energy UK Limited (Op)Talisman Sinopec North Sea LimitedTransworld Petroleum ( ) LimitedTalisman Sinopec Alpha LimitedTalisman Sinopec Oil Trading LimitedENI UK LimitedDana Petroleum (E&P) TypeEight-legged steel jacketPlatform WeightClaymore Production PlatformClaymore Accommodation Platform36,000 Tonnes 8,000 TonnesWellsProductionInjection32 (platform) 5 (Scapa Template)

3 4 (platform) 17 (Subsea)DrillingWell Slots36 Townhall 171201 Townhall 171201 Slide 15 Townhall Meeting17 December 2001 BEATRICECLAYMOREPETRONELLAMacCUL LOCHHANNAYCLYDEHALLEYBUCHANPIPERBRAES cotlandFlottaCruden BaySt. FergusNigg Bay0100 kmBEAULYA berdeenFULMARTLM Energy (UK) LimitedOil FieldGas FieldOil PipelineGas PipelineTalisman inc. Lundin InterestsBEECHNUTACORNROSSORIONBLAKEHIGH LANDER TARTAN AndrewC L A Y M O R EClaymore A , Infrastructure Code of PracticePage 2 Nearest InstallationsPiper Bravo Tartan 29 km E20 km SEAssociated FieldsScapa (Subsea template with flowline bundles and control umbilicals) km SW of ClaymoreCAPACITY PROJECTIONP rojected ullage (% of maximum capacity)DescriptionUnitMaxCapacity20132 014201520162017 claymore Separators(A & B parallel)

4 BPD180,000 Scapa SeparatorBPD32,000 Oil ExportBPD204,000 claymore Produced WaterBPD180,000 Scapa Produced WaterBPD45,000 claymore Water InjectionBPD160,000 Scapa Water InjectionBPD40,000 Gas CompressionMMscfd115,000 Gas Export--Gas LiftMMscfd115,000 Gas DehydrationMMscfd24,000H2S Removal--Available Capacities:> 25%5% to 25%< 5% Townhall 171201 Townhall 171201 Slide 15 Townhall Meeting17 December 2001 BEATRICECLAYMOREPETRONELLAMacCUL LOCHHANNAYCLYDEHALLEYBUCHANPIPERBRAES cotlandFlottaCruden BaySt. FergusNigg Bay0100 kmBEAULYA berdeenFULMARTLM Energy (UK) LimitedOil FieldGas FieldOil PipelineGas PipelineTalisman inc. Lundin InterestsBEECHNUTACORNROSSORIONBLAKEHIGH LANDER TARTAN AndrewC L A Y M O R EClaymore A , Infrastructure Code of PracticePage 3 PRIMARY SEPARATION PROCESSING FACILITIESC laymore fluids are separated in two horizontal vessels which operate in parallel, separating into oil, gas and water phases.

5 Oil is pumped through metering streams then into export pipeline. Produced water is treated in Hydrocyclones and a Degasser vessel before being discharged overboard. Scapa fluids are treated similarly with a dedicated single stage of Separation and Produced Water Hydrocyclones and TREATMENT FACILITIEST here is no gas export from the claymore platform. Gas from the claymore and Scapa Separators is combined and compressed to provide lift gas to the wells. There are three trains of compression each with two stages. Two trains are required to provide the necessary flowrates. Lift gas for Scapa is dehydrated in Molecular Sieves prior to Oil Export30 * km to WyeJoins main 30 oil line to Flotta TerminalCrude Oil Import24 * km from TartanGas Import16 reducing to 6 from Piper B / Frigg SystemClaymore / ScapaInterfield BundleWater Injection6 * 3 * km gas lift lines2* 10 * km production lines2 * 6 * km test/utility linesService pipelines11 / 8 claymore / Scapa water injection (CASWI)12 / 10 claymore water injection (CFE) Townhall 171201 Townhall 171201 Slide 15 Townhall Meeting17 December 2001 BEATRICECLAYMOREPETRONELLAMacCUL LOCHHANNAYCLYDEHALLEYBUCHANPIPERBRAES cotlandFlottaCruden BaySt.

6 FergusNigg Bay0100 kmBEAULYA berdeenFULMARTLM Energy (UK) LimitedOil FieldGas FieldOil PipelineGas PipelineTalisman inc. Lundin InterestsBEECHNUTACORNROSSORIONBLAKEHIGH LANDER TARTAN AndrewC L A Y M O R EClaymore A , Infrastructure Code of PracticeENTRY SPECIFICATIONS ubject to discussion and negotiationEXIT SPECIFICATIONC rude Oil ExportSet by Flotta Pipeline System entry requirementsGas ExportN/AProduced Water(Prevention ofOil Pollution Act 1971)<30 mg/L oil in water