Transcription of The Boiler Test Code 2018 - nameng.org.uk
1 The Boiler Test Code 2018 VOLUME 1 - Boilers 3 bar litres to 1100 bar litres Effective from 1st May 2018 Prepared by: 10 Gauge Railway Society, 7 Gauge Society, Association of 16mm Narrow Gauge Modellers, Gauge 1 Model Railway Association, Midland Federation of Model Engineers, Model Power Boat Association, Northern Association of Model Engineers, Southern Federation of Model Engineering Societies CONTENTS SECTION TITLE PAGE(S) 1 Introduction 1 2 Purpose 2 3 Definitions 2 4 Application 6 5 Design Verification 7 6 Preliminary Requirements and Preparation for Test 8 7 Examination Non-Commercially Built New Boilers 10 8 Commercially built boilers and their certificates 12 9 Examination Previously Tested Boilers 13 10 Hydraulic Test procedure 15 11 Safety Inspection and Steam Accumulation Test 17 12 Certification 19 Appendix A: Reference documentation 22 Appendix B: Regular or Routine Inspections & Maintenance 23 13 Index 24 Boiler Test Code 2018 Volume 1 1 1 Introduction This Test Code has been prepared by.
2 10 Gauge Railway Society 7 " Gauge Society Association of 16mm Narrow Gauge Modellers Gauge 1 Model Railway Association Midland Federation of Model Engineers Model Power Boat Association Northern Association of Model Engineers Southern Federation of Model Engineering Societies Walker Midgley Insurance Brokers This Code presumes that the model or miniature boilers are maintained and operated to at least the minimum standards as set out in Appendix B of the Code. Any failure to maintain and/or operate the Boiler to those minimum standards would result in Inspectors requiring more frequent or more extensive testing to be carried out.
3 The Health and Safety Executive considers it good practice for persons using pressure equipment to provide the same level of health and safety protection as they would if they were duty holders under the Pressure Systems Safety Regulations 2000 (PSSR). To aid this process, this Code has therefore been prepared using the principles of the PSSR. Where applicable this Code complies with PSSR 2000. It is considered that the procedures in this document represent good practice for model engineering applications. This document shall be considered as the Written Scheme of Examination as described in the PSSR, when used in conjunction with the test certificate associated with an individual Boiler .
4 When operating boilers where the Health and Safety at Work etc. Act 1974 applies, compliance with the requirements of PSSR shall be necessary. The PSSR require that the Test Code is used in conjunction with the applicable Written Scheme of Examination certificate. Steam locomotives, including model steam engines, are classed as installed systems for the purposes of the Regulations. Boiler Test Code 2018 Volume 1 2 Individuals or organisations seeking insurance need to check that the requirements herein are acceptable to their insurer. The provisions of this Test Code shall come into effect on 1st May 2018 and shall not be retrospective.
5 2 Purpose This Boiler Test Code is for the examination, testing and certificating of steam boilers owned and/or operated, for hobby purposes only. Steam boilers that are principally used for commercial business purposes ( for the purpose of earning a living, whether total or partial, for the owner of the business, for the operator of the business or for other persons employed by the business either full time or casually or persons who are connected in any way with the business) are outside the scope of this Boiler Test Code and cannot be examined, tested or certificated using this Boiler Test Code.
6 That boilers are constructed to a high standard, and any repairs or modifications are similarly to a high standard of safety. That the standard of safety is maintained throughout the life of the equipment. Following this code will enable the owner/user of a pressure system to fulfil duties and responsibilities that may be placed upon them by the requirements of the Pressure Systems Safety Regulations 2000 are satisfied (where applicable). That the Owner/User of a steam powered model or a steam powered boat has proof that the Boiler , of 3 bar litres or above but not exceeding 1100 bar litres (see paragraphs , and ), has been examined, tested and duly certificated.
7 The testing and certification of a Boiler is only necessary if the Boiler is to be put in to service. The validity dates of certificates issued do not have to run consecutively. 3 Definitions Shall is mandatory, should is advisory. Boiler : Any pressure vessel used for the generation of steam. Boiler Test Code 2018 Volume 1 3 Fittings: Devices attached to the Boiler to allow operation thereof. Including such items as safety valves, water level gauges, pressure gauges, regulators, stop valves, feed valves, check valves, blow-down valves, superheaters, etc. Mountings/bushes: Locations where fittings are attached to the Boiler .
8 Also, relates to the locations for fixing the Boiler to a frame or support, or for attaching other items to the Boiler . Working Pressure (PW): The maximum pressure at which, under normal circumstances, the Boiler is to be operated and to which the Boiler is certificated. Notes: The Working Pressure shall be marked on the pressure gauge (refer to paragraph ) It is recommended that the range of the pressure gauge should be at least 50% beyond Working Pressure. Safety valves shall be set to open at or below the Working Pressure (refer to paragraph ) Limit (Safe Operating) Pressure (PL): This is the maximum allowable pressure for the system in which a relief mechanism is fitted.
9 For steam pressure systems this is the Working Pressure (PW) plus 10%. This value is used for testing the correct operation of the relief mechanism only. Initial hydraulic shell pressure test: The hydraulic pressure test carried out on the Boiler shell on the initial completion of manufacture. The Boiler shell shall be fitted with blanking plugs as appropriate. The test pressure shall be twice the Working Pressure (2x PW). System hydraulic pressure test: The hydraulic pressure test carried out on the Boiler once all the Boiler fittings except the safety valves have been attached to the Boiler shell.
10 The system hydraulic pressure test shall be carried out at intervals prescribed in paragraph The test pressure shall be one and one-half times the Working Pressure ( PW). Boiler Test Code 2018 Volume 1 4 Inspector: a. This is a person who is competent to examine and report on all parts of the system as covered by the Test Code. An Inspector shall not inspect either equipment in their ownership or their own work unless that work has already been tested and passed by another Inspector. An Inspector shall be a member and appointed by the Committee of the Club or Society under whose name the Boiler is examined and/or tested after such persons have satisfied the Committee that they have the appropriate level of experience and/or qualifications.